eMail Arthur

Tunnel

This niche was for a light switch. Our visit of the tunnel starts at the commandpost.

It was built with prefabricated half circle concrete elements.

Bends were constructed with wooden shuttering.

The tunnel ends at the L 485. This side has been closed with bricks.